![]() | |||||
| |||||
|
|
#1 |
|
Insane Collector
Join Date: Sep 2003
Location: Stony Brook, N.Y.
Age: 100
Posts: 1,663
|
The hanger still needs some work, the doors have been installed and the the roof is just about complete. The final layout for the ramp was masked off and painted. Next will be building the security gate and gate house. Then we can start the detailing......Its starting to get the feel of the NPT as I remember it.
__________________
WIP: TIA DC10-30 CUB TU154 EAL L1011 Last edited by STEVEJ; 03-06-2008 at 12:25 AM. |
|
|
|
![]() |
| Thread Tools | |
| Rate This Thread | |
|
|