Hi. I am trying to build a model diorama of JFK airport. I am not sure if I should construct the Delta Worldport Terminal 3 and Terminals 5 and 6 as all three are slated to be demolished. I thought about building the proposed mega terminal that is supposed to replace the existing Term 6 and Term 5 buildings. Or perhaps I should just construct Terminal 3 for now since the new Delta terminal would most likely be years away from completion anyways...As for the new mega AA terminal..I already have lots of pics of the new terminal (in model format located in one of the existing AA terminals). It will take lots of work, perhaps 1-2 months to construct each terminal, alone. Don't worry guys. I have decided to take pics of each terminal and upload them on here (somehow)..

So instead of having to wait 1-2 yrs for the entire project to be completed, u just have to wait 1-2 months..
Brian